There was only 6' of cabinet space inside. |
|
Then we excavated and constructed a block foundation. |
|
After getting the outside weather tight, we began building partitions for a powder room with shower |
|
And over the next few days, we installed the cabinets |
|
|
|
|
|
and measuring less than 9' wide, this room needed to be opened up |
|
And when the framing went up, the look of a new 16'x16' kitchen began to appear. |
|
After the insulation was installed, we began to drywall all surfaces |
|
|
|
|
|
So we started by tearing off the existing kitchen and covered entry. |
|
By incorporating the reverse gable roof line, we were able to gain about 12" of ceiling height! |
|
In order to help cut costs, the homeowner painted all the walls and ceilings over the weekend. |
|
And finished off the powder room. |